Microcement is flexible enough to handle normal life, but it is only 2–3mm thick — so it moves with whatever it is bonded to. A crack in a microcement floor is nearly always a crack or a movement joint in the substrate underneath showing through. Over a sound, stable, properly prepared base, with reinforcing mesh in the build-up and existing joints carried through the finish, it does not crack.
Microcement is not a slab. It is a thin cement-and-polymer coating troweled over something else — a concrete floor, a tiled bathroom, a sheeted timber floor. At that thickness it cannot span or resist movement; it inherits it. If the surface underneath moves, flexes or splits, the finish on top eventually shows it.
That is why a good installer spends longer on your substrate than on the finish coats. Checking what you actually have is not a formality before the interesting part — it is the part that decides whether your floor is still perfect in ten years.
These two get confused constantly, and they are not the same problem. Crazing is a fine, shallow web of surface lines left by a coat that dried faster than it cured — cosmetic, usually preventable with site control, and addressed in the finish layers.
A structural crack follows something real underneath: a slab crack, a joint, a sheet edge, a doorway where two different floors meet. It runs reasonably straight, it reappears in the same place if you simply patch it, and the fix belongs in the substrate rather than the surface.
Two local conditions matter here. The first is new build: a lot of Gold Coast work happens on slabs poured months rather than years ago, and coating a young slab is the fastest way to inherit its shrinkage. The second is our older raised and high-set houses, where the floor is timber over bearers and joists — beautiful homes, but the floor moves, and it has to be made rigid before microcement goes anywhere near it.
Then there is summer. A closed-up house in February, or a coat catching afternoon sun through a wall of glass, dries far faster than it should. Controlling those site conditions during cure is part of the job, not an afterthought.
It is repairable. Cracks can be opened up, stabilised, refilled and re-troweled, then re-sealed — and because microcement is a coating rather than a slab, a repair blends far better than patching tile or concrete ever will.
But a repair only holds if the cause is dealt with first. If the crack is a moving slab or a bridged joint, filling the surface just resets the clock. We are happy to look at someone else's work and tell you which of the two you have.
Not because they are tiles. Sound, well-bonded tiles are one of the best substrates for microcement — rigid, flat and stable. The risk is drummy or loose tiles, and grout lines or tile edges that were not properly filled and reinforced before the coats went on.
It will if the floor flexes. Timber and particleboard floors need to be made rigid first, typically with fibre cement sheeting or a decoupling membrane system, before microcement is applied. Done that way, timber-framed floors take microcement very well.
Crazing is a fine surface web caused by a coat drying faster than it cured, usually from heat, wind or direct sun during application. It is cosmetic rather than structural and is addressed in the finish layers, but it points to site conditions that should have been controlled.
Yes. The crack is opened, stabilised, refilled, re-troweled and re-sealed, and the repair blends into the surrounding finish. The important part is fixing the cause underneath first, otherwise the same crack returns in the same place.
They fail differently. A moving slab will crack tiles and their grout too — it just shows up as a cracked tile or a popped grout line instead of a line through a seamless surface. Microcement has no grout to fail, but it also has nowhere to hide substrate movement, which is why preparation matters so much.
Light foot traffic comes well before full cure, and the sealer needs time to harden before it meets water, cleaning products or heavy furniture. We give you the specific dates for your job in writing, and we would rather tell you to wait than have you rush it and mark a floor you have just paid for.